MAINTENANCE WASH JOB CARD Date: __________ Vehicle: __________________________ Owner approval for condition photos, if needed: __________ Finish and installed protection Paint or other finish: _________________________________ Film, wrap, or coating name: ____________________________ Maker or installer care instructions checked: ___________ Waiting period or excluded area: _______________________ Site check Water source: __________ Runoff plan: _________________ Local authority and date checked: ______________________ Wash product and label mix: _____________________________ Required protection: ___________________________________ Tool assignments Upper paint: __________ Lower panels: __________________ Wheels: ______________ Glass: _________________________ Clean towel supply: ____ Used towel container: ________ Rinse check: ____________________________________________ Areas needing separate pre-wash: ________________________ Areas left untreated and reason: ________________________ Final glass, wheels, seams, and drip check: _____________ Customer handover note: ________________________________ Actual time by step: ___________________________________ Supplies to restock: ___________________________________